喷泉工程最新的验收规范

  喷泉工程是现在景观工程里非常具有代表性的网红项目。那么在喷泉工程制作完成之后验收的过程中需要注意哪些方面呢?今天专业音乐喷泉厂家的朱工整理了一些最新的工程验收的时候需要注意的规范供大家参考。

  Music fountain project is a very representative net red project in landscape engineering. So what aspects should we pay attention to in the process of acceptance after the completion of the fountain project? Today, Zhu Gong, a professional music fountain manufacturer, has sorted out some specifications that need attention when accepting and accepting projects for your reference.

  第一,音乐喷泉工程池底下的水泵是否安装牢固,这个涉及到后期水泵的使用寿命。

  第二,工程池底表面的水管是否焊接牢固,防止漏水,后期支撑喷泉稳定的水压。

  第三,按照合作之前的商量细节区一一对应检查是否达到约定。

  第四,检查给水输水系统的管件是否完整且不漏水。

喷泉工程完工效果图.jpg

  Firstly, whether the pump under the pool of the music fountain project is firmly installed involves the service life of the pump in the later period.

  Secondly, whether the water pipes on the bottom surface of the engineering pool are soldered firmly to prevent leakage and support the stable water pressure of the fountain in the later stage.

  Thirdly, check whether the agreement has been reached according to the detailed business area before the cooperation.

  Fourthly, check whether the fittings of the water supply and transportation system are complete and not leaking.

  喷泉工程的安装规范:

  喷泉工程的主要工艺流程:

  第一:预制及加工主要工艺流程 A、预制管道:放样画线→切割下料→钢管变曲→主管打孔→立管套丝→泵口加工→焊接立管→焊接法兰→一次清洗→二次镀锌→ 运往施工现场。 B、喷头加工:熔铜→铸造→车床车削→抛光处理→防腐处理→ 合格入库。 C、控制设备:元件检测→线路板焊接→整板调试→组件安装→ 整机调试→老化试验→合格入库。 D、配电设备:机箱加工→电气设备安装与连线→合格出厂。

  Installation Specification for Fountain Engineering:

  Main technological process of fountain engineering:

  First: Prefabrication and processing of the main process A, prefabricated pipelines: laying out lines cutting and cutting materials pipe bending main perforation riser sleeve pump mouth processing welding riser welding flange one cleaning Secondary galvanizing shipment to the construction site. B. Sprinkler processing: molten copper casting lathe turning polishing anticorrosion qualified storage. C. Control equipment: component testing circuit board welding whole board debugging assembly installation whole machine debugging aging test qualified storage. D. Distribution equipment: case processing electrical equipment installation and connection qualified factory.

  按照最新的喷泉工程系统要求调试前需要做如下准备

  1、清洁水池,并将水池注水至正常水位;

  2、清扫机房室内卫生及清洁设备外壳和柜(箱)内杂物;

  3、对电气设备进行干燥处理;

  4、检查系统流程安装是否完全正确;

  5、对电气设备进行单机试运行。

  Preparations for commissioning of fountain engineering system

  1. Clean the pool and inject the water into the normal water level.

  2. Cleaning the housings and cabinets of indoor sanitation and cleaning equipment in the machine room;

  3. Drying electrical equipment;

  4. Check whether the system process installation is correct.

  5. Single-machine test run of electrical equipment.

  喷泉工程的总体安装施工程序由于喷泉设备的安装需在施工现场进行,且为露天作业,所以对管道、电气、水下灯等凡有条件均应采取提前预制加工的方法,这是确保工程进度和工程质量的关键。

喷泉工程完工效果.jpg

  Because the installation of fountain equipment needs to be carried out on the construction site and is open-air operation, the pre-fabrication of pipelines, electrical and underwater lamps should be adopted in advance when conditions permit, which is the key to ensure the progress of the project and the quality of the project.

  对于整个喷泉工程来说检验的规范是最后一道质量的防线。很多的质量隐患都是在验收单位没有按照检验的规范区操作而造成的。这个时候我们就需要盯紧工程的每个环节,深化检查验收制度。好的工程一定经得起高便准的要求。如果按照如上最新的验收规范相信工程的品质会得到高标准的保障。

  For the whole fountain project, the standard of inspection is the last line of defense for quality. Many hidden quality hazards are caused by the failure of acceptance units to operate in accordance with the inspection norms. At this time, we need to focus on every link of the project and deepen the inspection and acceptance system. A good project must stand up to the requirements of high accuracy.